Solar Rooftop System
October 6, 2020
Power Backup For Telecom Tower
October 8, 2020

Off-Gird Solar System

OffGrid Pae Pin Taung 02

Project Location: Pae Pin Taung

Purpose: Lighting & Multi-media

No

Type of Solution

Solar Capacity

Inverter

1

Off-Grid Solar System (Battery Backup)

21.6 kW

7.5 kW

Off-Gird Solar System

Project Location: Bwit Gyi Toll Gate (pyi – Aung Lan)

Purpose: Solar Power Electrification for TOLL GATE

No

Type of Solution

Solar Capacity

Inverter

1

Off-Gird Solar System (Battery Backup)

15 kW

7.5 kW

Hybrid Solar System

Project Location: Bago Region

Purpose: Solar Power Electrification for Training

No

Type of Solution

Solar Capacity

Inverter

1

Hybrid Solar System (Solar, Grid, Battery )

3.2 kW

5.0 kW